Summary
Overview
Work History
Education
Skills
Certification
Accomplishments
Awards
Affiliations
HSE Aspects
Instrument/ Machinery/ Vessels
Geographical location worked
Timeline
Hi, I’m

Vipul Kumar

Senior Project Manager
Sintra,Lisboa
Vipul Kumar

Summary

Over Thirty years of rich Oil & Gas Sector experience in Feasibility, Concept select, FEED, Detailed Engineering, Project Management, Shut-down activities in FPSO, FSO and WHP, Contracts Management, Pre-Commissioning activities for Oil storage terminal, well pads development, Construction of Crude Oil Storage Terminals, Single Point Mooring operation and maintenance, SURF, Dry-Docking of CALM Buoy, Interface between various stake holders. Piling, heavy RCC concreting, industrial buildings, Manage & ensure implementation of detailed plans and strategies for the assigned projects that will lead to effective delivery fulfilling HSE/ Qualities requirements.

Overview

2

English C2 and Portugese B2

6
Certifications
32
years of professional experience

Work History

Step Integrated Solutions

Project Fabrication Manager
2025.05 - 2026.05 (1 education.year_Label)

Job overview

Managing project end to end for FPSO projects including CALM Buoy, suction piles, CS, SS, duplex, copper nickel piping, structural steel etc

QatarEnergy

Head-Operations
2018.08 - 2025.06 (6 education.years_Label & 10 education.months_Label)

Job overview

  • I joined QP as Head-Operations, various role in Operations in Oil Terminal, PS1/PS2/PS3/ ALR Offshore fields and NFA Gas fields offshore WHJ Boat landing etc. Major & Mini Shutdown execution jobs, Inspection, maintenance & Dry docking of 5 SBMs with subsea/ Floating hoses inspection, Maintenance and Operations for Cargo(Crude and Naptha) transportation in monthly offtake of 1 Million and 500,000 Oil Tankers through SBMs/ FSO operations, Contracts Management for SBM and utility maintenance vessel, Halul oil Terminal, works at various Wellhead Jackets, Work boats, Utility vessel, Well hook ups, Achievements- Lead 5 Major and mini SD execution Jobs without LTI and completing all assigned jobs in given time frame within budget. Interface between WHO, Contracts, materials, PMC & production stations. Member for 'Implementation of the Process Safety & QMO/ PSM Framework' project. To plan for safe environment and avoid any oil spill during floating and subsea hose change operations. Dry docking of SBM, New SBM manufacturing with all appurtenances, FSO Connection and moorings with SBM., All SBM maintenance activities, hydro dynamic and static analysis-hoses, specs of floating/ subsea hose, construction of 2 new SBM for USD 17 Mn.
  • Project Management activities for subsea pipeline modifications, Dry docking, shut down jobs, purchase of new SPM activities to complete the Project timely. Fabrication works for WHP in offshore for all type of structure and piping activities.

ChemieTech SSA

General Manager
2017.11 - 2018.08 (9 education.months_Label)

Job overview

  • General Manager for USD 2x 58Million Vapox Lesedi Crude Oil Storage Terminals in South Africa/ Swaziland 7 Nos Internal floating Roof tank 26.2m diameter x 22.3m height 3 Nos for fixed roof and fire protection supported 38.6m diameter and 22.3m height for storage of crude oil 3 Nos by using Jacking method, slop additive tanks, Fire water tank, erection of Pumps, compressors and vapor recovery unit, Installation of firefighting system, structural steel 4500T, piping 75000inchdia and pipeline, Piling works, Gantry works. Achievement- tackled local issues and taking project on fast track. Member of Asset Integrity and Containment & recovery team in case of oil spillage. Piping fabrication and installation works for the Project.
  • Executing the grass root project on EPC Basis and was involved in Concept, FEED, Detailed engineering and construction phase including risk assesments, Hazop, Hazid and change management

Cairn India Vedanta oil
Gurgaon, Haryana

General Manager
2015.06 - 2017.11 (2 education.years_Label & 5 education.months_Label)

Job overview

  • Worked as Project Director- Providing Construction Support, giving Technical advice, Implement, Coordinate Execution, Collaboration, Integration-working on onshore pipeline of GSPC, QPF for Sudan petroleum, working on judgment to close deal on marginal Fields. Supported on various bidding
  • Cairn Energy India March 2006-Dec 2016 ( USA, India HO and at Barmer Site)

Cairn India Limited (Vedanta Group)

Strategic Business Functional Delivery Manager
2014.11 - 2015.05 (6 education.months_Label)

Job overview

  • Worked as Functional Project Delivery Manager-Strategic Business Unit-2 Head Projects for Development of Barmer Hill shallow tight oil reserve of 360million barrel and in-charge for 5 Marginal oil field with QPF concept with Project cost of USD 300 Million. 9 well pads/ intrafield pipeline.CO2 disposal strategy, concept select and cost optimization under budget, estimation, procurement and execution
  • Cairn India Limited (Vedanta Group)

Cairn Energy Ltd

Project Delivery Manager
2008.11 - 2014.11 (6 education.years_Label)

Job overview

  • Project Delivery Manager I Delivered India's one of the biggest Crude Oil Terminal and onshore Crude carrying pipeline on Nov 14, 2016 in very challenging conditions because of local issues spreaded in 165 hectares. Consisted of 7-60Mt Diameter 20 meters height truss supported cone roof tank for Crude of 56k m3 each & 4 LFO tanks of 35x16m single deck internal floating roof tanks 15k m3 each/ two Interface hold up tank, 175k Inch diameter Piping, 125k m3 RCC, 3 Boilers (10T/Hr), 3 Nos each High capacity Export & 3 booster pumps, 3 Gas turbines(12MW), Water Treatment Plant, CTM, 24 Packages. 24 Buildings and Export Pipeline for USD 1243 Million in Gujarat, India. Operations and maintenance activities related to Bhogat oil offtake through SBM.
  • Cairn Energy India Ltd

Cairn Energy PLC, UK

Senior Manager-Engineering
2006.03 - 2008.10 (2 education.years_Label & 7 education.months_Label)

Job overview

  • Led cross-functional engineering teams to optimize project delivery and enhance operational efficiency.

Malaysia marine & heavy Engg(Petronas)
Johor bahru, Malaysia

Offshore Lead Commissioning Engineer
2005.05 - 2006.02 (9 education.months_Label)

Job overview

  • Preparation of procedures and Reinstatement packages
  • Developing Procedures for FATs, Mechanical Completion & Acceptance; Pre-Commissioning, Commissioning, and Start-Ups
  • Work with client’s operations department to Develop the Commissioning Team
  • Be available onsite to work with the teams responsible for Mechanical Completion & Acceptance; Pre-Commissioning, Commissioning, and Start-Up.
  • Review the ITRs (Inspection, Test and Records) Prepared by Project team
  • Conduct the Job Safety Analysis, Prepare the Commissioning Report / Certificates
  • Conduct the Commissioning at the Anchorage and offshore site
  • Sand Cyclone, Sand Accumulation Vessel, Fuel Gas KOD Inspection & Final Box up, Glycol line, Fuel Gas Line, Chemical Injection line, Closed drain, vent, Well Head, Lifeboat Davit, Pedestal Crane, Monorail, ½” & 3/8” Tubing Commissioning, weighing activity supervision for offshore module
  • Commissioning Activities of offshore modules (Mechanical Equipment & piping). SPAR Platform
  • Murphy Oil’s Kikeh Spar deep water Project (Dry Tree Unit)

Reliance Petroleum
Lucknow, UP

Territory Project Manager
2004.10 - 2005.04 (6 education.months_Label)

Job overview

  • 41 Petroleum Outlet and Gas Pipeline Project of 1000 Kms
  • Contracts Management, Design Review role for various activities
  • Civil/ Structural/ Piping/ Electrical works
  • Involved in Pipeline fabrication and installation
  • Samsung Corporation Limited, Overseas Assignment in Seoul, South Korea

Niko Resources Ltd
Surat, Gujarat

Senior Offshore Project Engineer
1999.10 - 2003.07 (3 education.years_Label & 9 education.months_Label)

Job overview

  • Installation of Six leg, 16 Slot, unmanned drilling cum production platform in shallow water in Gulf of Cambay, A 140 Million US$ Project, 140MMSCf of gas & 10,000 BOPD of crude oil
  • Pre Trenching/ Post Trenching and Burial of 2-16” & 12” Gas Production pipelines and Riser, Schedule 160/ fabrication, drilling activities & skirt piles in Singapore office.
  • Supervised Geo Technical Survey on MV Mariner-CPT, Boring till 100 meters in seabed for soil litho logy and piling data for 36”/48”/66” OD, Geo Physical Survey on MV Volans- High precision water depth by multi beam Echo sounder, Sea floor imaging by side scan sonar, metal objects detection by marine magnetometer, ultra high resolution of sub bottom profiling by pinger array.
  • Finalization of Shore Base studies-River channel survey with Malviya 14, studies of route, facilities on shore base including chopper detail
  • Fabrication, Installation & Commissioning (DNV Codes of 12” Schedule 120/ 80/ 40 API LX Grade 56 Sub sea pipeline), 5 Kms by Post trenching method, 40mm Coating as per BS 4164 & AWWA C 203-91, Cathodic Protection System. Installation of 36” Low pressure and High Pressure Header and necessary Tie-in works. Installation Fabrication of 4” Flow lines Schedule 80. Installation of 35 MT Steel Pipe support bridge including Fabrication and installation of Emergency escape Bridge in case of Hazards
  • Shut Down Activities-Cleaning- Inspection & Welding of Separator Vessels, Installation of Meter run, 16” & 12” Flanges, Installation of 12” Ball Valves, Non Return Valves of 900#class.
  • Leading HSE issue and oil spillage and recovery
  • Pigging Operations every 6 months for 12” Flow lines, Installation work of new separator and related piping and tie in works, Copper slag blasting with polyurethane painting. Hydro testing works for spool pieces and full piping network.
  • L & T Chiyoda Limited, Resident Construction Manager, IOCL Indmax Project. US$ 35 Million

Engineers India Limited

Senior Engineer
1993.12 - 1998.06 (4 education.years_Label & 6 education.months_Label)

Job overview

  • Involved in Grass Root refinery 78 Storage tanks, Piping works structural and Pipeline
  • Sulpher Recovery Unit-Technological Structure, Pipe rack, fabrication and installation with launching method of 2 Steel structure bridges of 150 tonnes each on two canals including 100 bored cast in situ piles and Pile Cap. Fabrication of 50 Nos storage tanks with Civil foundation and Dyke wall.
  • Plant Engg & Contract Works- Preparation of Scope of Work, Special Condition of Contract, General Condition of Contract, Material Take off and Specifications
  • Storm water Reservoir l=2.5 kms, d=3.5 mts & Pump house.
  • Main & Utility Control room- RCC- 5000 Cum, Rebar-1000 MT, False Flooring, False Ceiling, Texture outer Finish (85 X 34 meters)
  • Plant Piping work, OWS Line, Closed Blow Down line and storm water Drains.
  • India’s leading consultancy organization which gives PMC, Engineering & EPC services to clients across the globe.
  • L & T Chiyoda Limited, Resident Construction Manager, IOCL Indmax Project. US$ 35 Million

Education

Visvesvaraya Technological University

Bachelor of Engineering

University Overview

GPA: First Class

University of Pennsylvania's Wharton School
USA

from Great Management Program
01.2013

University Overview

Stanford Advanced Project Management - Leading Strategic Execution (XAPM111) score of 93%

Indian Institute of Management, Ahmedabad
Ahmedabad, India

from Star Trek Leadership Mgmt Prog
01.2012

University Overview

Various Courses/ Trainings

IIT Mumbai
Mumbai, India

from Piping Engineering
01.2003

University Overview

Professional Engineer-United Kingdom

NICMAR

Post Graduate Diploma from Construction Management
01.1997

University Overview

GPA: First Class

Skills

MS Office 2000-Hands on, conversant with MS Project

Conversant with SAP system

ASME B318, ASME B 314

DNV, BS, IS, DIN, ISO

CSA Z24520 FBE and PE Coating

Certification

Name: Vipul Kumar

Accomplishments

Project Delivery in stipulated time frame, excelling in challenging environment, innovation, Strategic decision-making capabilities in Achieving targets, Interface between wells, drilling, project, contracts & operations, Proven Leadership capabilities

Awards

Great People Manager award 2013 & 2014, Cairn Achievers award 2012, Outstanding Employee recognition in 2010 n 2013, Energy & Positivity Champion 2013, well pad design champion 2010,, Commissioning of subsea gas pipeline in Niko Resources before schedule, Completion of Oil Terminal and Engineering of Mangla Oil Facility and MBA oil and gas fields

Affiliations

  • American Society of Non Destructive Testing ASNT Level II in Radiography and Penetration
  • Panel member for methane conference at GAIL in 2016

HSE Aspects

PHSER I to PHSER V, HAZOP, HAZID, RFSU , OISD Audits, Implementing Gated Process, Oil spill containment and recovery, JHA for various operations, Risk Assessment Register

Instrument/ Machinery/ Vessels

Echo Sounder, Shot Blasting Equipment, Compressor, Holiday detector, Pipe Locator, Pipe layers, NDT equipment, Pedestal Crane , survey package, operations work in work boat, Utility maintenance vessel

Geographical location worked

India/ South Africa/ South Korea/ Malaysia/ USA/ Qatar/ Sharjah

Timeline

Project Fabrication Manager

Step Integrated Solutions
2025.05 - 2026.05 (1 education.year_Label)

Head-Operations

QatarEnergy
2018.08 - 2025.06 (6 education.years_Label & 10 education.months_Label)

General Manager

ChemieTech SSA
2017.11 - 2018.08 (9 education.months_Label)

General Manager

Cairn India Vedanta oil
2015.06 - 2017.11 (2 education.years_Label & 5 education.months_Label)

Strategic Business Functional Delivery Manager

Cairn India Limited (Vedanta Group)
2014.11 - 2015.05 (6 education.months_Label)

Project Delivery Manager

Cairn Energy Ltd
2008.11 - 2014.11 (6 education.years_Label)

Senior Manager-Engineering

Cairn Energy PLC, UK
2006.03 - 2008.10 (2 education.years_Label & 7 education.months_Label)

Offshore Lead Commissioning Engineer

Malaysia marine & heavy Engg(Petronas)
2005.05 - 2006.02 (9 education.months_Label)

Territory Project Manager

Reliance Petroleum
2004.10 - 2005.04 (6 education.months_Label)

Senior Offshore Project Engineer

Niko Resources Ltd
1999.10 - 2003.07 (3 education.years_Label & 9 education.months_Label)

Senior Engineer

Engineers India Limited
1993.12 - 1998.06 (4 education.years_Label & 6 education.months_Label)

NICMAR

Post Graduate Diploma from Construction Management

IIT Mumbai

from Piping Engineering

Indian Institute of Management, Ahmedabad

from Star Trek Leadership Mgmt Prog

University of Pennsylvania's Wharton School

from Great Management Program

Visvesvaraya Technological University

Bachelor of Engineering
Vipul KumarSenior Project Manager